University City Schools 1999 Paving Program
Client: U. City School District
Owner: U. City School District
Completion Date: Sep 1999
Const. Value: $350,000
This project involved preparation of
contract plans and specifications for eight (8) elementary school asphalt
parking lots and playgrounds within the district.
ABNA also provided full construction
management services including materials testing for the project.
This was a fast track project for ABNA as the design, bidding, and
construction all had to be completed within a nine-week period.
Existing parking lots were removed,
regraded and resurfaced. New parking lots were designed and constructed to
support the districts maintenance truck fleet. Drainage design and other
utility adjustments were also incorporated in the plans. The design
utilized the recycling of the asphalt pavement as fill material in areas
where the existing subgrade was unstable.
Commerce Bank in Ellisville
Client: HBE Financial Facilities Owner:
Commerce Bank
Completion Date: Feb 1999
Const. Value: $600,000
ABNA provided the construction
layout of a new 3500 Square Feet Commerce Bank at Ellisville. Project
involved establishing control points, benchmarks and setting grid for
initial grading. Also involved layout of building corners, column
locations, sewer/sanitary lines and water lines. Also laid out the curb
and gutter on offsets and set radius points for rounded ends. Also set
final grade stakes for pavement subgrade.
A.G. Edwards Parking Garage and Building
“F” Expansion
Owner: AG Edwards
Completion Dates:
Parking Garage – Oct 2000
Building “F” – Sep 2003
ABNA is currently working on two
projects for the expansion of the AG Edwards campus near downtown St.
Louis. The new office building “F” will contain 1 million square feet of
office space. The parking garage has 6 levels (2 below ground and 4 above)
that will accommodate 2600 parking spaces. The parking garage has
post-tensioned members that require special inspection before, during, and
after concrete is poured. We are also performing NDE’s (Non-Destructive
Evaluations) on steel structural members for building F and concrete
testing and rebar inspections for both structures.
North & South Broadway - Wards Project
Client: Zurheide-Hermann
Owner: City of St. Louis
Completion Date: Mar 2001
Const. Value: $4,000,000
ABNA conducted routes surveys on a 12
mile section of Broadway. This involved providing topographic surveys and
cross sections every 100 ft. ABNA also provided engineering design for a
2 mile section of the alignment. The design included improving the
vertical profile, drainage and utility adjustments.
AB Brewery Expansion
Client: PSI
Owner: Anheuser Busch
Completion Date: Oct 2000
Const. Value:
Current phase of project involves
asphalt and concrete inspection for a 60,000 square foot parking lot for
the expanded brewery facility.
BJC North Campus Parking Garage & Hospital
Addn.
Owner: BJC Facilities
Completion Date: Sep 2001
Const. Value:
The parking garage has 6 levels (2
below ground and 4 above) with 250,000 square feet on each level. We are
also providing inspections for a 12-story 3 million square foot hospital
addition. The parking garage has post-tensioned members that require
special inspection before, during, and after concrete is poured.
|
Highlands at Forest Park Commercial Center
Client: Clayco Construction
Owner: Balke Development
Completion Date:
ABNA provided all material testing
and construction staking for this new office development on Oakland Avenue
near Forest Park. Construction staking included layout for all access
roads within the site as well as locating the corners for the foundation
of the three story pre-fabricated concrete - tilt-up structure. Layout
for the roads was done “on-call” under construction. The coordinates for
the roads had to match control points tied into Oakland Avenue. Materials
tested included soil, concrete, asphalt, and structural steel.
Washington University Student Housing Phase I
Owner: Washington University
Completion Date: Apr 2001
Const. Value: $30,000,0000
ABNA worked with PSI to provide soil
inspections and NDE’s (Non-Destructive Evaluations) for welded structural
members for four 3 story housing units. We are also conducting special
inspections for BOCA compliance (national fire, mechanical, plumbing,
electrical, and reinforcement codes) during construction.
References
We appreciate the importance of customer
satisfaction. Below is a sampling of the clients that we have been proud
to serve.
BJC
Facilities Group
9890 Clayton Rd
St. Louis, MO 63124
Contact: Mr. Jim Lieberman
314-953-1933
Christner
Architects
7711 Bonhomme Ave., Ste 100
St. Louis, MO 63105
Contact: Mr. Todd Jacobs
314-725-2927
City of University City
Department of Public Works
6801 Delmar Boulevard
University City, MO 63130
Contact: Mr. Lonnie Williamson
314-863-3208
Clayco Construction
2199 Innerbelt Business Center
St. Louis, MO 63114
Contact: Mr. Eric Seber
314-429-5100
HBE Financial Facilities
Inc.
11330 Olive St. Rd.
St. Louis, MO 63141
Contact: Mr. Cecil Aycock
314-567-9000
Kozeny-Wagner, Inc.
951 West Outer Road
Arnold, MO 63010
Contact: Mr. Dave Dubois
314-296-2012
KWAME Building Group
200 S. Hanley
St. Louis, MO 63105
Contact: Mr. Tony Thompson
314-862-5344
Metropolitan Sewer
District
2000 Hampton Ave.
St. Louis, MO 63139
Contact: Mr. William Ehrhard, PE
314-768-6200
PSI
8669 Olive Blvd
U-City, MO 63132
Contact: Mr. Rick Porter
314-432-8073
City of St. Louis
1200 N. Market, Room 301
St. Louis, MO 63103
Contact: Ms. JoAnn Peebles
314-589-6613
University City
School District
8346 Delcrest Drive
University City, MO 63124
Contact: Mr. Roger CayCe
314-872-1904
Village
Academy Education Center
Contact: Mr. Sam Britts
10 Kingsbrook Lane
Olivette, MO 63132
314-997-4323

|