University City Schools 1999 Paving Program
Client: U. City School District
Owner: U. City School District
Completion Date: Sep 1999
Const. Value: $350,000

 This project involved preparation of contract plans and specifications for eight (8) elementary school asphalt parking lots and playgrounds within the district. ABNA also provided full construction management services including materials testing for the project. This was a fast track project for ABNA as the design, bidding, and construction all had to be completed within a nine-week period.

 Existing parking lots were removed, regraded and resurfaced. New parking lots were designed and constructed to support the districts maintenance truck fleet. Drainage design and other utility adjustments were also incorporated in the plans. The design utilized the recycling of the asphalt pavement as fill material in areas where the existing subgrade was unstable.

Commerce Bank in Ellisville
Client: HBE Financial Facilities Owner: Commerce Bank
Completion Date: Feb 1999
Const. Value: $600,000

 ABNA provided the construction layout of a new 3500 Square Feet Commerce Bank at Ellisville.  Project involved establishing control points, benchmarks and setting grid for initial grading. Also involved layout of building corners, column locations, sewer/sanitary lines and water lines. Also laid out the curb and gutter on offsets and set radius points for rounded ends. Also set final grade stakes for pavement subgrade.

 A.G. Edwards Parking Garage and Building “F” Expansion
Owner: AG Edwards
Completion Dates:
Parking Garage – Oct 2000
Building “F” – Sep 2003

 ABNA is currently working on two projects for the expansion of the AG Edwards campus near downtown St. Louis. The new office building “F” will contain 1 million square feet of office space. The parking garage has 6 levels (2 below ground and 4 above) that will accommodate 2600 parking spaces.  The parking garage has post-tensioned members that require special inspection before, during, and after concrete is poured.  We are also performing NDE’s (Non-Destructive Evaluations) on steel structural members for building F and concrete testing and rebar inspections for both structures.

North & South Broadway - Wards Project
Client: Zurheide-Hermann
Owner: City of St. Louis
Completion Date: Mar 2001
Const. Value: $4,000,000

ABNA conducted routes surveys on a 12 mile section of Broadway. This involved providing topographic surveys and cross sections every 100 ft.  ABNA also provided engineering design for a 2 mile section of the alignment. The design included improving the vertical profile, drainage and utility adjustments.

AB Brewery Expansion
Client: PSI
Owner: Anheuser Busch
Completion Date: Oct 2000
Const. Value:

Current phase of project involves asphalt and concrete inspection for a 60,000 square foot parking lot for the expanded brewery facility.

BJC North Campus Parking Garage & Hospital Addn.
Owner: BJC Facilities
Completion Date: Sep 2001
Const. Value:

The parking garage has 6 levels (2 below ground and 4 above) with 250,000 square feet on each level.  We are also providing inspections for a 12-story 3 million square foot hospital addition. The parking garage has post-tensioned members that require special inspection before, during, and after concrete is poured.

 

Highlands at Forest Park Commercial Center
Client: Clayco Construction
Owner: Balke Development
Completion Date:

 ABNA provided all material testing and construction staking for this new office development on Oakland Avenue near Forest Park.  Construction staking included layout for all access roads within the site as well as locating the corners for the foundation of the three story pre-fabricated concrete - tilt-up structure.  Layout for the roads was done “on-call” under construction.  The coordinates for the roads had to match control points tied into Oakland Avenue.  Materials tested included soil, concrete, asphalt, and structural steel. 

Washington University Student Housing Phase I
Owner: Washington University
Completion Date: Apr 2001
Const. Value:  $30,000,0000

ABNA worked with PSI to provide soil inspections and NDE’s (Non-Destructive Evaluations) for welded structural members for four 3 story housing units.  We are also conducting special inspections for BOCA compliance (national fire, mechanical, plumbing, electrical, and reinforcement codes) during construction.

References

We appreciate the importance of customer satisfaction. Below is a sampling of the clients that we have been proud to serve. 

BJC Facilities Group

9890 Clayton Rd

St. Louis, MO 63124

Contact: Mr. Jim Lieberman

314-953-1933

 

Christner Architects

7711 Bonhomme Ave., Ste 100

St. Louis, MO 63105

Contact: Mr. Todd Jacobs

314-725-2927

 

City of University City Department of Public Works

6801 Delmar Boulevard

University City, MO 63130

Contact:  Mr. Lonnie Williamson

314-863-3208

 

Clayco Construction

2199 Innerbelt Business Center

St. Louis, MO  63114

Contact: Mr. Eric Seber

314-429-5100

HBE Financial Facilities Inc.

11330 Olive St. Rd.

St. Louis, MO 63141

Contact: Mr. Cecil Aycock

314-567-9000

 

Kozeny-Wagner, Inc.

951 West Outer Road

Arnold, MO 63010

Contact: Mr. Dave Dubois

314-296-2012

 

KWAME Building Group

200 S. Hanley

St. Louis, MO 63105

Contact: Mr. Tony Thompson

314-862-5344

 

Metropolitan Sewer District

2000 Hampton Ave.

St. Louis, MO 63139

Contact: Mr. William Ehrhard, PE

314-768-6200

 

PSI

8669 Olive Blvd

U-City, MO  63132

Contact: Mr. Rick Porter

314-432-8073

 

City of St. Louis

1200 N. Market, Room 301

St. Louis, MO 63103

Contact: Ms. JoAnn Peebles

314-589-6613

 

University City School District

8346 Delcrest Drive

University City, MO 63124

Contact: Mr. Roger CayCe

314-872-1904

 

Village Academy Education Center

Contact: Mr. Sam Britts

10 Kingsbrook Lane

Olivette, MO 63132

314-997-4323