Highlands at Forest Park Phase I
Completion Date: Nov 2000
Const. Value: $8,000,000
ABNA provided all material testing
and construction staking for this new office development on Oakland Avenue
near Forest Park. Construction staking included layout for all access
roads within the site as well as locating the corners for the foundation
of the three story garage. Layout for the roads was done “on-call” under
construction. The coordinates for the roads had to match control points
tied into Oakland Avenue. Materials tested included soil, concrete,
asphalt, and structural steel.
North & South Broadway - Wards Project
Completion Date: Mar 2001
Const. Value: $4,000,000
ABNA conducted route surveys on a 12-mile section of Broadway. This
involves topographic surveys and cross sections every 100 ft. ABNA also
provided engineering design services for a 2-mile section of the
alignment. Design components included improving the vertical profile,
drainage and utility adjustments.
Katy Bike Trail Extension
Completion Date: Dec 1999
Const. Value: $500,000
ABNA conducted a topographic survey of the ditch sections along
approximately 6,500 feet proposed alignment of the Katy Trail extension,
located within property known as the Missouri Research Park. ABNA also
located property corners and utilities as provided by the client and set
horizontal and vertical survey control points, for the construction phase
of the project. ABNA also provided additional topographic surveys to tie
the alignment to the existing Katy Trail.
Design Surveys for MSD
ABNA has provided a number of surveys for MSD design
projects over the last several years. The requirements of these surveys
have ranged from preparing strip maps, easement plats, and topos to flood
plain studies. Below is a list of various MSD projects and the surveying
services ABNA has provided on each.
Gravois Trunk Sanitary Relief Sewer
St. Louis Metropolitan Sewer District
Completion Date: June 2000
Construction Value: $35,000,000
Surveying Services: Performed over 8 miles of
topographic survey, established 60 boring locations, and preliminary strip
maps.
|
Garner Prather Relief Sewer
Metropolitan Sewer District
Completion Date: May 2001
Construction Value: $350,000
Surveying Services: Provided the strip map,
topographic survey, and easement plat.
Harlem Baden Combined Storm & Sanitary Phase I
Metropolitan Sewer District
Completion Date: June 2000
Construction Value: $485,000
Surveying Services: Provided the strip map,
topographic survey, and easement plat.
King George & Bonfils Basins Infiltration/Inflow Studies
Metropolitan Sewer District
Completion Date: April 1999
Prof. Service Fee: $16,500
For this project ABNA performed manhole elevation
surveys for George Butler & Associates. The scope of the project included
over 600 manholes between the two projects.
We started the project by establishing the location
of all manholes and flagging and numbering them for ease of
identification. We then identified MSD Bench marks and performed a level
circuit between all benchmarks to verify accuracy of Benchmark elevations.
Temporary Bench marks were set between the MSD benchmarks.
A level circuit loop was conducted daily to establish
the rim elevations of the identified manholes. All loops had to close
within two hundredths of a foot.
Breckenridge to Baltimore Storm Channel
Metropolitan Sewer District
Completion Date: March 1999
Const. Value: $3,000,000

|