North & South Broadway - Wards Project
Client: Zurheide Hermann
Owner: City of St. Louis
Completion Date: Mar 2001
Const. Value: $4,000,000
ABNA conducted route surveys on a 12-mile section of Broadway. This
involves topographic surveys and cross sections every 100 ft. ABNA
also provided engineering design services for a 2-mile section of the
alignment. Design components included improving the vertical profile,
drainage and utility adjustments.
Breckenridge to Baltimore Storm Channel
Client: St. Louis MSD
Owner: St. Louis MSD
Completion Date: Feb 1999
Const. Value: $3,000,000
The objective of this project was to evaluate the hydraulics of the 1200’
channel and size it for a 15-year storm event to alleviate flooding on
Warson Road and nearby
residential and commercial parking. A bridge over the channel at
Breckenridge Road was supported by timber piles and in poor condition due
to scouring. One challenge was to replace the bridge structure without
disturbing the hydraulics of the new storm channel.
Other challenges included minimizing the need for easements and utility
relocations to accommodate improvements, minimizing disruption to
businesses and residential property owners, addressing traffic flow on
Breckenridge Ave. during bridge
reconstruction, and future traffic requirements for the bridge.
Harlem Baden Combined Storm & Sanitary Sewer Phase I
Client: St. Louis MSD
Owner: St. Louis MSD
Completion Date: Jun 2000
Const. Value: $300,000
The objective of this project was to increase the capacity of the combined
sanitary/storm lines within a four-block area around Barrett Brothers
Park. New junction boxes and manholes were designed to connect the new
relief lines to existing lines and provide additional outlets for surface
drainage. All of this is accomplished within a narrow strip of easement
between homes in a mature neighborhood.
|
New
Mississippi River Bridge carrying I-70
Client:
Modjeski & Masters
Owner:
Illinois DOT
Est.
Completion Date: Jun 2003
Const. Value:
ABNA is working closely with the
prime consultant Modjeski & Masters to provide various design and contract
management services for this project. Design services include surface
drainage for the main span, levee relocation where the bridge touches down
on the Illinois side, and designing inspection platforms. Contract
management services include invoice control, scheduling, and document
control.
Metrolink Cross County Extension
Client:
Cross County Collaborative
Owner: Bi-State
Est. Completion Date: Sep 2003
The program manager hired
ABNA to establish the coordinate position of “second-order” monumentation
markers for the entire 8-mile light rail extension section. Fifteen (15)
1st order monuments were set. Approximately 100 2nd order monuments 500’
apart along the 8-mile alignment. ABNA provided route surveys for the
alignment. Also provided boundary surveys to establish ROW for the
alignment. ABNA prepared ROW plats to document ROW takings. A
monumentation manual was also developed by ABNA.
Lindbergh Tunnel
Client: URS Corporation
Owner: City of St. Louis/ MoDOT
Completion Date: Jan 2002
Const. Value: $60,000,000
This project includes the design of the south
1,120-foot section of tunnel planned to run beneath the new
runway/taxiways in conjunction with the St. Louis Lambert Airport
expansion plan. ABNA will be designing the roadway approaches to the
tunnel as well as the main roadway surface within the tunnel. The roadway
design also includes all subsurface and surface drainage and site plans.

|